PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Staggered wire Mesh at the 3rd Floor. (1) (800x600).jpg Pouring concrete at the 3rd Floor From A-D to 1-4 Facing North (800x600).jpg Staggered wire Mesh at the 3rd Floor. (2) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (3) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (4) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (5) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (6) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (7) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (8) (800x600).jpg
Previous pageNext page Staggered wire Mesh at the 3rd Floor. (4) (800x600)
Staggered wire Mesh at the 3rd Floor. (4) (800x600)